Project Management

Effective project management is essential for organizing work and achieving objectives. It encompasses a variety of practices that span from the initial design phase to resource allocation and maintaining data integrity. Below are some key best practices to follow.

At the Beginning of a Project Create a Top Level Project Map

Initiating a project effectively requires the creation of a top-level project map. This map outlines the project's structure and delineates how various components will interconnect. The benefits of such a map are manifold:

  • Enhanced Transparency: A representation of the project's framework allows for clear communication among stakeholders, ensuring that everyone has an understanding of the big picture.

  • Facilitated Work Decomposition: Breaking down larger tasks into smaller, manageable pieces becomes more straightforward with an overarching plan in place.

  • Prevention of Architectural Errors: Early identification and resolution of potential design flaws can be achieved by mapping out interactions and dependencies from the start.

With this strategic overview established early on, team members gain clarity regarding their roles and responsibilities. This fosters collaborative efficiency and paves the way for successful project execution.

Adhere Strictly to Product Requirements

When creating programs and applications, it's crucial to focus strictly on meeting the specified requirements. This ensures that the final output precisely aligns with the given specifications, minimizing the risk of issues during testing.

Adding extra features can prolong the testing phase and introduce complexities, potentially hindering successful outcomes. It's important to stick to the specified requirements and avoid unnecessary enhancements.

By concentrating on meeting only what is outlined in the product specifications, developers can streamline their work, improve efficiency, and increase the likelihood of delivering a robust program or application that meets its intended purpose without unnecessary complications.

Preparing Projects for Multiple Languages and Cultures

When creating a project that might be used in various parts of the world, it's wise to think about this early on. Planning for different languages and cultural needs from the beginning can be included in the design of the project. This foresight ensures that expanding the project to new areas is smoother and less costly.

Consider Scalability in Project Planning

When embarking on a project, it's crucial to weave scalability into the planning process. This foresight helps prevent hitting roadblocks when the time comes to broaden the project's scope. Ignoring scalability can lead to a situation where growing or modifying the project becomes an uphill battle.

Take, for example, the approach of designing a model that selectively reads parameters from a device. Instead of pulling every available parameter, which can be inefficient and cumbersome, one could craft a list that includes only those parameters that are necessary. The model is then configured to ignore any parameter not specified on this list. Should there be a need for additional parameters down the line, updating this list is all it takes—no need for an overhaul of the entire system.

By planning with future growth in mind, projects are shaped with adaptability and scalability at their core, making them more resilient and capable of evolving over time.

Using Directories and Many-to-Many Tables Instead of Direct References and Constants

Incorporating direct references and constants into code can seem like a straightforward approach initially. However, this method can lead to complications over time. When parameters embedded directly in the code change, it often requires extensive effort to locate every instance where they were used and update them one by one.

On the other hand, utilizing directories lays a solid foundation for expanding projects in the future. It allows for centralized management of information that might need to be updated or referenced across various parts of an application.

Moreover, relying on constants has its drawbacks as it can result in inconsistent naming for identical parameters within different areas of a system. This inconsistency necessitates the creation of complex structures filled with conditions designed to link disparate sections of an application cohesively.

By using directory tables instead, systems gain flexibility because these tables enable multiple connections between data points without duplicating information. This structure simplifies updates and maintenance while ensuring consistency throughout an application's ecosystem.

In most cases it's better to use a unique string ID as an entry ID in the directory and write detailed information in the other fields (such as entry description).

Here are some examples of directory usage:

  • A good example is using a measurement unit directory that can be divided into three fields: code, short name, full name. The values from the directory will be used throughout the whole project. For variables it's possible to bind another variable's values as valid values. You should add the corresponding record to bindings in the variable format. The target is the field, to which you want to bind the directory, with the #choices parameter:

A special  function is written in the expression specifying the path to the directory and field names to be used as the name and description of the selected variable field:

  • Another useful example of directory usage is a many-to-many table with error codes. Consider a function with a script blocker mechanism that triggers when an incorrect batch total is received. If the function returns an error code that is handled with a special many-to-many table, it will be much easier and more convenient to respond to errors and inform the user. Consider the following examples.

Without a directory, error handling is less successful. The batch total is being checked at one of the rule set steps. It the batch total is incorrect, the rule set is exited. The result is the text message specified in the expression, which is not convenient to handle:

In such cases it's more convenient to use a directory. The message text from the picture above must be replaced by the error code:

The directory contains fields for this error code with short and full description of the error in several languages.

An error triggers a special processing rule. The rule will be universal for the whole project and it's recommended to include it in a separate function.

The processing rule receives the error code as an input and selects an appropriate error message from the directory depending on the current user role and the language used.

The example illustrates how a directory enables convenient error processing, takes into account the role model, and is compatible with many languages.

Group Parts of the Project According to Their Meaning

By creating context groups, it becomes easier to navigate through the project and understand its layout. This not only helps with maintaining a better structure, but also helps in making quick and efficient modifications in the future.

Example of context groups:

Do Not Leave Behind Junk Resources

Maintaining a tidy and efficient workspace is crucial when working on any project. This involves careful management of various elements such as contexts, functions, and bindings. Otherwise, these can build up over time and lead to a disorganized environment.

To prevent the accumulation of unnecessary resources, it's wise to remove them once they're no longer in use. For those resources that are needed for testing or as backups, setting up designated groups is a smart move. This organization aids in quickly finding and eliminating what is not needed later on.

When conducting tests on functions or rules, creating duplicates with clear labels like forTest can be very helpful. These labels signal which items are temporary and should be discarded after testing concludes. In the case of bindings, duplicating them with a note at the start of the expression can serve as a reminder that they're just for test purposes.

By following these simple practices, one can ensure their workspace remains clutter-free and more manageable.

Avoid Creating Redundant Contexts

In project management, it is crucial to use resources wisely and avoid making copies that aren't needed. Designate a single project lead or person responsible for the design of the project structure. Rather than having many versions of something, it's better to have one main item that can be used in different situations.

Consider Permissions, Users, and Roles

When setting up projects, it's crucial to think about the people who will use them. These users have different roles and need specific permissions. Permissions are like keys that unlock access to certain areas of a project. They help make sure that each person can only go into parts of the project they're allowed to see or change.

Assigning Appropriate Rights

For every part of a project, decide who should be able to do what. This means giving the right level of access to each user based on their job within the project:

  • View Only: Some users may only need to look at information without changing it

  • Edit: Others might need permission to update or add new information

  • Administrate: A few might require full control to manage all aspects of the project

By carefully choosing who gets which permissions, you can protect your project from mistakes or security issues caused by unauthorized actions.

Create Personal Accounts with Admin Permissions if You’re not Using LDAP

When managing server activity, it's useful to have personal accounts that come with admin permissions. These accounts make it clear who is responsible for any changes made to a project. This level of clarity is crucial when LDAP (Lightweight Directory Access Protocol) isn't in place to track user actions.

Having individual admin accounts boosts responsibility among team members. Each person's actions can be seen and reviewed, which promotes an open environment where everyone knows who did what. This approach helps in maintaining order and ensuring that the project runs smoothly.

Here's why setting up these accounts is beneficial:

  • Accountability: It becomes straightforward to pinpoint who made specific alterations

  • Monitoring: Oversight of the project is improved since all activities are associated with a distinct account

  • Control: With each person having their own access, unauthorized changes can be prevented or quickly addressed

In summary, personal admin accounts are essential for keeping a tight rein on server operations, particularly when LDAP isn't available as a tracking solution.

Was this page helpful?